- 0
- 0
- Days
- 0
- 0
- :
- 0
- 0
- :
- 0
- 0
Package Qty | Priced per Package |
---|---|
1-4 | US $8.24 |
5+ | US $1.73 |
I Want Mixed Products
480Pcs 4 Style Dyed Natural Wood Beads, Oval/Oblong, Lead Free, Green, 6~23x4~9mm, Hole: 2~3mm, 120pcs/style(WOOD-PH0002-47)
Comments: Please input your mixed request.
Item Code: Please input the item code.
Comments: Please input your mixed request.
480Pcs 4 Style Dyed Natural Wood Beads, Oval/Oblong, Lead Free, Green
Size:
Round: about 6x4~5mm, Hole: 2mm, about 120pcs;
Round: about 8x7mm, Hole: 3mm, about 120pcs;
Round: about 10x9mm, Hole: 3mm, about 120pcs;
Oval/Oblong: about 23x8~9mm, Hole: 2.5mm, about 120pcs;
Box: 22x16x1.5cm, 1pc.
Priced per 1 Box
Please Note: The color may be slightly different from the picture because of different display device.
Size | 6~23x4~9mm, Hole: 2~3mm, 120pcs/style |
Material | Wood |
Color | Green |
Shape | Oval |
Usage | Beads |
Package Size | 1 Box per package |
Search by Image
·Search mybeadsfindings with an image instead of text. Try dragging an image here.
Uploading File