• Package Qty Priced per Package
    1-4 US $8.24
    5+ US $1.73
  • 3 Days
    Shipping Weight: 168(g)
  • Ask a Question

    480Pcs 4 Style Dyed Natural Wood Beads, Oval/Oblong, Lead Free, Green, 6~23x4~9mm, Hole: 2~3mm, 120pcs/style(WOOD-PH0002-47)

    *Category:

    Please select a category.

    Comments:

    Please input your request.

    I Want Smaller Lots

    480Pcs 4 Style Dyed Natural Wood Beads, Oval/Oblong, Lead Free, Green, 6~23x4~9mm, Hole: 2~3mm, 120pcs/style(WOOD-PH0002-47)

    Original Packing

    • QTY : Package
    • Package Size : Box/package
    Box

    Invalid Input

    I Want Mixed Products

    480Pcs 4 Style Dyed Natural Wood Beads, Oval/Oblong, Lead Free, Green, 6~23x4~9mm, Hole: 2~3mm, 120pcs/style(WOOD-PH0002-47)

    Comments: Please input your mixed request.

    • Item Code: Please input the item code.

      Comments: Please input your mixed request.

    + Add Mixed Products

  • Product Description

    480Pcs 4 Style Dyed Natural Wood Beads, Oval/Oblong, Lead Free, Green

    Size:

    Round: about 6x4~5mm, Hole: 2mm, about 120pcs;

    Round: about 8x7mm, Hole: 3mm, about 120pcs;

    Round: about 10x9mm, Hole: 3mm, about 120pcs;

    Oval/Oblong: about 23x8~9mm, Hole: 2.5mm, about 120pcs;

    Box: 22x16x1.5cm, 1pc.

    Priced per 1 Box

    Please Note: The color may be slightly different from the picture because of different display device.

  • Specification Size Info

    Size 6~23x4~9mm, Hole: 2~3mm, 120pcs/style
    Material Wood
    Color Green
    Shape Oval
    Usage Beads
    Package Size 1 Box per package
  • Customer Questions

    Subscribe to our mailing list

    Confirm

    Please Note

    OK

    Please Note

    OK

    Search by Image

    ·Search mybeadsfindings with an image instead of text. Try dragging an image here.

    • 1. The image must be in one of the following formats: .jpg, .png, .jpeg, .bmp, .gif, .webp, .tiff, .ppm
      2. The size of the image should be less than 5M!
      3. The image length and width must be greater than or equal 200 pixels and smaller than or equal to 1024pixes.
    • 1. The image must be in one of the following formats: .jpg, .png, .jpeg, .bmp, .gif, .webp, .tiff, .ppm
      2. The size of the image should be less than 5M!
      3. The image length and width must be greater than or equal 200 pixels and smaller than or equal to 1024pixes.

    Uploading File